Cidade de Itajai arrives

Published

Cidade de Itajaí (Photo: OOG)

OOG-TNK unit arrives at Brazil's Santos Basin

The FPSO Cidade de Itajaí has arrived in the Santos Basin, Petrobras announced on 2 January 2013.

The OOG-TKP vessel arrived on 29 December and will be connected to six production and five injector wells within the Baúna and Piracaba field production system. It is expected to begin production later this month.

The Cidade de Itajaí FPSO can process up to 80,000 barrels of light oil and compress 2 million cubic meters of natural gas per day.

Current News

Equinor Drills Dry Well in Barents Sea

Equinor Drills Dry Well in Bar

Santos Posts 25% Profit Fall, Plans to Cut 10% of Jobs

Santos Posts 25% Profit Fall,

Suriname, Guyana Plan Cross-Border Team for Join Gas Projects

Suriname, Guyana Plan Cross-Bo

Eco Wave Power Wraps Up Feasibility Study for South Africa’s Wave Project

Eco Wave Power Wraps Up Feasib

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine