Offshore Construction News - page 49


Mapping a platform

Feb 04, 2015

Laser scanning with real-time results using offshore-approved tablets is coming, say Carl Bennett and Stewart Buchanan. Linking together data from multiple surveys to create whole platform virtual model Images from Wood Group ODL…

Industry set for new MPD guidelines

Feb 02, 2015

Jerry Lee reports on new guidelines for managed pressure drilling operations due out this year from both ABS and API. Pacific Drilling’s Pacific Santa Ana drillship, classed by ABS, has been outfitted…

Keeping a cool head in the Arctic

Feb 02, 2015

Golder Associates’ Ken Been explains the best approach to geotechnical engineering and pipeline construction when facing scours and pits in the Arctic ice. Fig. 1: Ice scouring.  Over the coming decades…

EMAS AMC secures US$65 million in contracts

Jan 30, 2015

EMAS AMC secured multiple new awards valued at more than US$65 million. Scope of work includes project management, engineering, and transportation and installation works for a floating production storage offloading (FPSO) vessel in Africa…

Lewek Constellation nears completion

Jan 30, 2015

EMAS AMC's flagship ice-classed, DP3 multi-lay construction vessel Lewek Constellation is on track to turn fully operational by March 2015.  The vessel, which has heavy lift capabilities, has already secured a backlog of nearly US$0.5 billion…

Vioco progressing Gazelle project

Jan 30, 2015

Africa focused small-cap player Azonto Petroleum is continuing its work on the offshore Ivory Coast Gazelle field, despite difficulties in the market.  A field development plan, submitted by operator and 87% equity holder Vioco, which is 35% owned by Azonto…

Hess cuts budget but stays with deepwater

Jan 27, 2015

New York-headquartered Hess says it is cutting its 2015 capital and exploration budget by 16%, compared to 2014, to US$4.7 billion. While the firm said most of the cash (45%/$2.1 billion) would be spent on its unconventional shale resources…

Technip lands Amethyst contracts

Jan 27, 2015

Technip won two contracts for flexible pipe supply and installation at the Amethyst field, in Mississippi Canyon 26, in the US Gulf of Mexico.  The Deep Blue. From Technip.   Both contracts are for operator Stone Energy…

Gazprom targets Baltic LNG

Jan 22, 2015

Russia’s Gazprom announced plans to build a new LNG plant on the Baltic Sea on Thursday (22 January).  The project, called Baltic LNG, will be built at Ust-Luga, in the Leningrad region, near the Gulf of Finland. It will be capable of producing 10 MPTA of LNG…

Hejre topside time-lapse

Jan 20, 2015

DONG Energy provides this time-lapse video of the Herje topsides construction process, which took place from April to October 2014. Hejre is Dong Energy’s first high-pressure, high-temperature (HPHT) development and is expected to begin production in 2017 with an estimated 170 MMboe…

Total fires up HPHT West Franklin project

Jan 15, 2015

Total has started gas and condensate production from the high-pressure, high-temperature (HPHT) West Franklin Phase 2 project in the Central Graben area of the UK North Sea. The project, tapping 85 MMboe, will supply 40,000 boe/d to the…

LMC in US$110 Jurong Brazil contract

Jan 14, 2015

Singapore’s Jurong Shipyard awarded Ezra Holding subsidiary London Marine Consultants (LMC), a contract to supply an external turret mooring system for the Libra field’s extended well test (EWT) FPSO vessel. The Libra oil field is a large…

AVEVA opens Saudi Arabia office

Jan 14, 2015

AVEVA opened a new office in Saudi Arabia to strengthen its presence in the Middle East and further enhance its growing global network. The office will offer sales and support for all of AVEVA’s solutions and services, with particular focus on owner operators (OOs) and engineering…

Schnitger chief calls for early engineering analysis

Jan 13, 2015

Schnitger President Monica Schnitger urged oil and gas companies to explore and exploit the latest technologies to have successful projects at the 2014 Bentley Systems Year in Infrastructure conference. Meg Chesshyre has more.   “I’m…

Van Oord receives Damen vessel

Jan 09, 2015

Van Oord took delivery of Damen’s offshore carrier (DOC) 8500 cable laying vessel, the Nexus. The Nexus. From Damen.   The Nexus is a 126-m vessel that will be used for the installation…

Current News

Oil Edges to 2-Week High on Ukraine News

EMGS to Conduct CSEM Survey Offshore India

Poland to Open New Areas for Offshore Wind Development in Baltic Sea

Swedish Firm Eyes Multi-Megawatt Wave Energy Farm Off Grenada

Subscribe for OE Digital E‑News