Huisman Building Drilling System for CMHI

Posted by Michelle Howard
Friday, September 14, 2018

This week, China Merchants Heavy Industries (CMHI) awarded Huisman a contract for the engineering and fabrication of a drilling system which will be integrated and installed on the moored drilling semi-submersible constructed at CMHI Haimen.

This drilling system will be used for oil and gas drilling activities in shallow to medium water depths all around Asia, particularly the South China Sea.

The contract is a result of a constructive cooperation between CMHI and Huisman during the semi’s concept design. The drilling system comprises an 1800kips static rated load Dual Multi Purpose Drilling Tower (DMPT), a single pipe setback drum,  innovative manipulator arms for pipe and tool handling, top drive, iron roughnecks, skid carts, catwalk machines, gantry and deck cranes, drillers cabins and Huisman’s fully integrated control system.

The Dual Multi Purpose Tower (DMPT) will be delivered in the second quarter of 2020 to CMHI Jiangsu Yard in China. Fabrication and final commissioning of the completed DMPT will take place at Huisman China.

Categories: Contracts Offshore Offshore Energy Drilling Engineering Subsea

Related Stories

BOEM Boosts Monetary Penalties for Oil & Gas firms

Shell Comes Up Dry Offshore Namibia

DeepOcean Adds High-Spec Subsea Vessel to Its Fleet

Current News

SouthCoast Wind gets final BOEM nod

Oil set for fourth week of gains on US sanctions

Rex Subsidiary Lime Petroleum AS Awarded New License in Norway

SLB Profits Top Analyst Expectations

Subscribe for OE Digital E‑News