Huisman Building Drilling System for CMHI

Posted by Michelle Howard
Friday, September 14, 2018
Photo: Huisman Equipment BV

This week, China Merchants Heavy Industries (CMHI) awarded Huisman a contract for the engineering and fabrication of a drilling system which will be integrated and installed on the moored drilling semi-submersible constructed at CMHI Haimen.

This drilling system will be used for oil and gas drilling activities in shallow to medium water depths all around Asia, particularly the South China Sea.

The contract is a result of a constructive cooperation between CMHI and Huisman during the semi’s concept design. The drilling system comprises an 1800kips static rated load Dual Multi Purpose Drilling Tower (DMPT), a single pipe setback drum,  innovative manipulator arms for pipe and tool handling, top drive, iron roughnecks, skid carts, catwalk machines, gantry and deck cranes, drillers cabins and Huisman’s fully integrated control system.

The Dual Multi Purpose Tower (DMPT) will be delivered in the second quarter of 2020 to CMHI Jiangsu Yard in China. Fabrication and final commissioning of the completed DMPT will take place at Huisman China.

Categories: Contracts Offshore Offshore Energy Drilling Engineering Subsea

Related Stories

Saipem Renews Offshore Activities Agreement With Saudi Aramco

Saipem Renews Offshore Activities Agreement With Saudi Aramco

Malaysian Firm Enters Cable Laying Business with Vessel Acquisition

Malaysian Firm Enters Cable Laying Business with Vessel Acquisition

Aker Solutions Introduces Three Floating Wind Foundation Designs

Aker Solutions Introduces Three Floating Wind Foundation Designs

Current News

Mitigate SCC & HE to Keep Offshore Metal Structures Ship Shape

Saipem Renews Offshore Activities Agreement With Saudi Aramco

Equinor to Stop Offshore Construction of Empire Wind Project in US

Greensand CCS Scheme in North Sea Lines Up First CO2 Storage Customer

Subscribe for OE Digital E‑News

Offshore Engineer Magazine