Stena Drilling Retires Semi-Submersible Rig

Laxman Pai
Thursday, October 4, 2018

Stena Clyde (Australia) Pty Ltd have decided to remove the Stena Clyde from active service and retire the rig from the Stena Drilling fleet.

The rig has been warm stacked in Australia for the past three years and is presently in Singapore.  Although there has been some recent interest in operating the rig in the region, these opportunities have not materialised to the extent necessary to continue supporting the rig.

Stena signed a contract in February with Timor Sea Oil & Gas Australia for the Stena Clyde drilling rig for a campaign that was supposed to start around April or May this year.

Since 1996, when the rig entered the Stena Drilling fleet, she has delivered high performance operations, starting in the North Sea before making her way to Asia and Australia.

The Stena Clyde will be put up for sale.

The Stena Clyde is a semi-submersible, twin pontoon, column stabilized drilling unit of an Aker H3 design built. The vessel has been modified with an additional six stability columns to provide adequate operating deck load for operations in 1,640ft water depths. It was built by Rauma Rupola in 1976 and modified in 1985 and 1997.


Categories: Ship Sales Drilling Decommissioning Rigs

Related Stories

Well-Safe Solutions Secures $25M Well Decom Contracts in North Sea

Deep C Delivers Lifting Tool for North Sea Decommissioning Project

Archer and Elemental Energies Set Up P&A Well Engineering JV

Current News

Danos Leaders Recognized in “40 Under 40” Lists

ExxonMobil to Drill for Gas Off Cyprus in January

Mocean Energy Raising Funds to Advance Wave Energy Tech

Seadrill’s Drillships Getting Ready to Start Work Off Brazil

Subscribe for OE Digital E‑News