LDA’s First Wind Farm Maintenance Vessel Launched

Monday, October 8, 2018

Louis Dreyfus Armateurs Group’s (LDA) first service operation vessel dedicated to the maintenance of offshore wind farms for the Danish giant Ørsted was launched in Turkey at the CEMRE shipyard, where the vessel has now entered the final construction phase.

The new vessel, Wind of Change, is scheduled for final delivery early next year. It will be operated for Ørsted and will allow technicians to perform turbine maintenance at the Borkum Riffgrund 1 & 2 and Gode Wind 1 & 2 wind farms off Germany.

Last April, Ørsted ordered a second maintenance vessel to be delivered in 2021, dedicated to the Hornsea Two fields off the coast of England.

Length Overall: 83 m
Breadth: 19.4 m
Depth molded: 7 m
Draught summer (design): 5 m
Propulsion: Diesel electric propulsion, Dynamic positioning DP2
Accommodation: Capacity of 90 persons including more than 60 wind farm technicians



Categories: Shipbuilding Offshore Workboats Vessels Dynamic Positioning Wind Power Renewables Offshore Wind

Related Stories

First Russian Ice-Class LNG Carrier Hits Water

Floating Offshore Wind: Fuel for Shipbuilding and Ship Repair

Windward Offshore Lines Up Key Suppliers for New CSOV Fleet

Current News

NKT Secures Two High-Voltage Cable Projects for TenneT’s 2GW Program

First Russian Ice-Class LNG Carrier Hits Water

Oil and Gas Reclaiming Center Stage as Climate Efforts Fall Behind

Oil Rises on China Stimulus Hopes, US Inventory Drop

Subscribe for OE Digital E‑News