Bourbon Awarded Floating Wind Farm Work

Posted by Michelle Howard
Monday, October 22, 2018

Bourbon Subsea Services has been selected by Windplus to install three floating wind turbines of 8.3 MW, 20 km off Viana do Castelo, Portuguese coast. 

These turbines, with a total capacity of 25 MW, are the most powerful in the floating offshore wind industry. The project includes project management, engineering and the procurement of the complete mooring system (supplied by Vryhof).

The mooring systems with three sets of three mooring lines will be pre-laid in the first phase. The wind turbines will be then towed to the offshore site and hooked up in a second phase, which will also include the installation and hook up of the inter-array electrical cables. Bourbon will provide a variety of marine assets required for the different phases of the operations, including AHTS, tugs and remotely operated vehicles (ROV).

With strong experience in mooring installation of floating wind turbines, the Bourbon Subsea Services project team will work closely with WindPlus, Vryhof and Principle Power, designer of the floating foundations, to ensure the successful delivery of this project.

“After having installed the prototype in 2011, we are very pleased to have now been chosen to support this significant European commercial floating wind farm project. The opportunity permits Bourbon to reaffirm its commitment to contributing to the growth of the Renewable Energy industry and demonstrate its unique expert capability in delivering technologically innovative turnkey services to demanding clients” commented Patrick Belenfant, Bourbon Subsea Services’ CEO.

Categories: Technology Vessels Wind Power Offshore Energy Renewable Energy Subsea Industry News Activity Support Vessel ROV & Dive Support Renewables

Related Stories

ABS, Akselos Sign Floating Wind MOU

Toyo Buys SMD’s ROV Trencher for Japan’s Offshore Wind Sector

Delmar Signs Up Lankhorst for Culzean Floating Wind’s Mooring Lines

Current News

OE’s 2024 Top of the Festive Video Pops

Offshore Drilling 2025: 3 Things to Watch During a Year of Market Corrections

Chevon’s Sanha Lean Gas Connection Project Achieves First Gas off Angola

BP and Partners Secure Rights for 450MW Offshore Wind Farm in Japan

Subscribe for OE Digital E‑News