Ramp up at Kiliwani North

OE Staff
Monday, July 4, 2016

Aminex has increased gas production from the Kiliwani North-1 well, offshore Tanzania.

The well, drilled on the Kwiliwani North field from Songo Songo Island island, was brought on stream in April. It reached 30 MMcf/d boe at the weekend and the commissioning process at the Songo Songo Island gas plant, from which a pipeline will carry the produced gas to the mainland, is expected to be concluded with the testing of the well due to determine optimal rates.

The field was discovered in 2008 and contains an estimated 28 Bcf contingent resources. 

Categories: Natural Gas Africa

Related Stories

TGS Embarks on Multi-Client 2D Survey off Angola

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Eni’s Congo LNG Phase 2 Begins Exports with First LNG Cargo (Video)

Current News

AF Offshore Secures North Sea Decom Job

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Petronas Takes Operatorship of Oman’s Offshore Block 18

Subscribe for OE Digital E‑News