Keppel on track to deliver Catcher FPSO

OE Staff
Friday, April 28, 2017

Keppel Shipyard says it is on track to deliver the Catcher floating production storage and offloading (FPSO) vessel to BW Catcher following a naming ceremony of the vessel today (28 April).

BW Catcher - the 11th FPSO Keppel has delivered to BW Offshore - is set to go on a seven-year fixed term and 18 years of options contract with UK North Sea operator Premier Oil on the Catcher field.

BW Catcher has 650,000 bo oil storage capacity and 60,000 b/d processing capacity. It has a design life of 20 years without dry docking and will be moored using a submerged turret production at an average water depth of 90m.

Keppel Shipyard's work scope on the FPSO include the installation and integration of topside modules. BW Catcher is scheduled for sailaway from the shipyard in the next few months and is on track to achieve its first oil in 2017.

The Catcher area is expected to produce 96 MMboe, with a peak production rate of around 50,000 b/d. The development includes 22 subsea wells on the Catcher, Varadero, and Burgman fields, tied back to the leased FPSO BW Catcher.

Read more

Premier cuts Catcher costs

Categories: Floating Production Fabrication Europe North Sea FPSO

Related Stories

DNO Strikes North Sea Oil Offtake Deals with ExxonMobil and Shell

Dräger to Supply Gas Detection, Monitoring Tech to North Sea Operator

Oil and Gas Redevelopment Project off Norway Gets $1.8B Approval

Current News

Equinor Renews Subsea Inspection Deal with Subsea 7

Saipem Gets DNV Certification for Offshore Asset Lifecycle Management

Archer to Remain North Sea Drilling and Maintenance Duty for Aker BP

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

Subscribe for OE Digital E‑News