Wood Group gets Echidna work

OE Staff
Friday, April 7, 2017

Wood Group was awarded a multi-year contract from Karoon Petróleo & Gás to provide owner’s engineering services to support the full field development for the Echidna field offshore Brazil marking the first project between the two companies. The contract will be executed by Wood Group’s Rio de Janeiro office focusing on the technical requirements of a floating production unit (FPU) and subsea structures, and all bid package evaluations and execution phase. The equipped FPU will be located in the Echidna field within the Santos Basin and moored in a maximum water depth of 400m.

“Our ability to deliver local world-class design capabilities with a range of available tools and software made Wood Group a partner of choice for the field development project,"saidHugues Corrignan, managing director of Wood Group Brazil’s office. “Wood Group’s competitive bid, provided an excellent opportunity for both companies to establish a mutually rewarding partnership for current and future developments.”

Read more:

Premier awards topside O&M contract to Wood Group

Wood Group wins Mad Dog 2 work

Karoon hits at third Santos well

Karoon confirms Echidna oil

Categories: Floating Production Design South America Engineering Subsea Contracts Vessels

Related Stories

Longitude Unveils Compact PSV Design Aimed at Cost Efficiency

Floatel Firms Up Accommodation Rig Contract with Brava Energia off Brazil

Rovtech, Unique Group to Expand ROV Reach to Middle East and Asia

Current News

Transocean to Acquire Valaris for $5.8B

ADNOC, RWE Explore LNG Supply Deal as Germany-UAE Deepen Ties

Eni’s Congo LNG Phase 2 Begins Exports with First LNG Cargo (Video)

Perenco Installs Kombi-II MOPU Offshore Congo

Subscribe for OE Digital E‑News