Draugen subsea module heavy lift

OE Staff
Monday, June 6, 2016

Heerema Marine Contractor's Thialf heavy lift vessel lifted the new subsea pump control module (PCM) onto Shell's Draugen platform offshore Norway late last month.

The 220-tonne control module is the topside part of the subsea pump system, which is planned to be commissioned later in 2016. The pump will boost production from the Draugen subsea wells. 

Categories: Subsea North Sea

Related Stories

AF Offshore Secures North Sea Decom Job

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

TGS Gets Another OBN Acquisition Job in North Sea

Current News

AF Offshore Secures North Sea Decom Job

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Petronas Takes Operatorship of Oman’s Offshore Block 18

Subscribe for OE Digital E‑News