Pacific Drilling rescinds Zonda contract

OE Staff
Thursday, October 29, 2015

Pacific Drilling announced that it has exercised its right to rescind the construction contract for ultra-deepwater drillship Pacific Zonda due to the failure by Samsung Heavy Industries (SHI) to timely deliver a vessel that substantially meets the criteria required for completion of the vessel in accordance with the construction contract and its specifications. Pacific Drilling made advance payments totaling approximately $181.1 million under the contract, and will be seeking a refund of the installment payments.

The Pacific Zonda was to be an upgraded dual load path Samsung 12000 design dynamically-positioned, dual gradient-capable drillship meant for moderate environments and water depths up to 3657m (12,000ft) using 18¾-in BOP and 21in OD marine drilling riser.

The drillship was originally meant to be delivered in Q2 2015.

Categories: Asia Construction

Related Stories

Petronas Takes Operatorship of Oman’s Offshore Block 18

NOV’s GustoMSC to Design Korea’s Wind Turbine Installation Vessel

Cadeler’s Nexra Lines Up O&M Campaign in Taiwan

Current News

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Petronas Takes Operatorship of Oman’s Offshore Block 18

France Lowers Renewable Goals, Backs Nuclear in New Law

Subscribe for OE Digital E‑News