Technical issues strike Cobalt's North Platte campaign

OE Staff
Thursday, April 9, 2015

Cobalt International Energy opted to plug and abandon its North Platte No. 2 appraisal well at Garden Banks Block 959 in the deepwater Gulf of Mexico due to a seal failure in the riser connection system, the company announced on 9 April.

The well, drilled by the Rowan Reliance drillship, was at a depth of 20,701ft when the problem with the riser was detected. The well was permanently abandoned prior to reaching any geological targets.

Cobalt is currently permitting the North Platte No. 3 well approximately 200ft from the surface location of the North Platte No. 2 well. Assuming timely receipt of permit approval, Cobalt anticipates spudding the North Platte No. 3 well within two weeks and continues to expect well results in 2H 2015.

Drilled in 2012, the North Platte No. 1 discovery well encountered over 550ft net of oil pay in multiple high-quality inboard Lower Tertiary reservoirs. Cobalt, as operator, holds a 60% working interest in North Platte. Total holds the remaining interest.

Categories: Drilling Gulf of Mexico Rigs

Related Stories

Baker Hughes: US Rig Count Remains Steady

Analysts: Trump Hardening Iran Policy Might Not Stem Flow to China

US Gulf of Mexico Oil and Gas Output Goes Down Ahead of Storm

Current News

Elliott Affiliate's Citgo Bid to be Challenged

Euro Oil Giants Rethink Renewable Balance

Global Offshore Wind Stumbles to the End of '24

Eco Wave Power Gets Permit for Its First US Wave Energy Project

Subscribe for OE Digital E‑News