Technical issues strike Cobalt's North Platte campaign

OE Staff
Thursday, April 9, 2015

Cobalt International Energy opted to plug and abandon its North Platte No. 2 appraisal well at Garden Banks Block 959 in the deepwater Gulf of Mexico due to a seal failure in the riser connection system, the company announced on 9 April.

The well, drilled by the Rowan Reliance drillship, was at a depth of 20,701ft when the problem with the riser was detected. The well was permanently abandoned prior to reaching any geological targets.

Cobalt is currently permitting the North Platte No. 3 well approximately 200ft from the surface location of the North Platte No. 2 well. Assuming timely receipt of permit approval, Cobalt anticipates spudding the North Platte No. 3 well within two weeks and continues to expect well results in 2H 2015.

Drilled in 2012, the North Platte No. 1 discovery well encountered over 550ft net of oil pay in multiple high-quality inboard Lower Tertiary reservoirs. Cobalt, as operator, holds a 60% working interest in North Platte. Total holds the remaining interest.

Categories: Drilling Gulf of Mexico Rigs

Related Stories

OP/ED: When it Comes to Offshore Energy, Be Careful What You Wish For

Norway Greenlights DNO’s North Sea Drilling Campaign

Aker BP Set for Drilling Ops in Norwegian Sea

Current News

Oil Dips on Larger US Crude Draw, Russia Sanctions

TVO Contracts 4C Global Consultancy to Support UK Clients

Protecting Employees in High-Risk Environments

Industry Award for Sustainable Drilling Waste Solution

Subscribe for OE Digital E‑News