Paradigm releases upgraded version of Sysdrill

OE Staff
Monday, September 8, 2014

Paradigm has released the latest version of Sysdrill 10, its integrated suite of well planning and drilling engineering applications.

This upgrade is integrated with Peloton’s WellView/MasterView corporate database for drilling and well operations, and includes a jar placement module based on technology acquired from Cougar Drilling Solutions.

The release offers engineering enhancements to the product’s existing well planning, torque & drag, hydraulics, casing design, cementing and well control modules. Thenew jar placement module allows calculation of optimal jar locations based upon the jar operating parameters, drilling parameters, and the well trajectory.

The integration with Peloton offers a complete solution for well planning, drilling engineering, daily reporting and data management throughout the well lifecycle. Drilling engineers can send a fully engineered Sysdrill well design to WellView, and during drilling operations, data captured in MasterView can be used in Sysdrill to perform engineering analysis to monitor drilling and prevent NPT events.

“Sysdrill 10 allows drilling engineers to perform advanced engineering analysis with minimum effort, in a single, integrated application, thus saving valuable time, says Robert Innes, director for well planning and drilling. “This is particularly the case through the integration with Peloton, where drilling engineers avoid re-entering data and focus on ensuring the well can be drilled safely and successfully. The incorporation of Cougar’s Jar Placement program, which can be licensed by all Paradigm customers, demonstrates that Sysdrill provides a solid platform that can be easily extended to incorporate new engineering algorithms.”

Sysdrill 10 will be on display at booth #3028 at the SPE Annual Technical Conference and Exhibition in Amsterdam, 27-29 October.

Categories: Products Drilling Engineering Well Operations

Related Stories

NOV’s GustoMSC Presents Quick Connector for Heavy Lift Cranes

BP's Whiting IA Refinery Restart Delayed

Woodside’s Trion FPU Enters Construction Phase

Current News

Danos Leaders Recognized in “40 Under 40” Lists

ExxonMobil to Drill for Gas Off Cyprus in January

Mocean Energy Raising Funds to Advance Wave Energy Tech

Seadrill’s Drillships Getting Ready to Start Work Off Brazil

Subscribe for OE Digital E‑News