AGR

OE Staff
Friday, February 10, 2012

AGR’s Aberdeen-based consultancy division has doubled its manpower in the Falklands to supply a team to its well management division to work on the Leiv Eiriksson. Following a six-month recruitment drive, the company expected to deploy a 50-strong team of consultants – both on and offshore the Falklands and in support roles in Aberdeen – from January. Desire Petroleum and Rockhopper Exploration contracted AGR’s well management division to undertake a six-well drilling campaign in the area in 2009.

Categories: Energy Activity Europe Well Operations

Related Stories

Two Injured as Glomar’s OSV Hits Offshore Wind Turbine in North Sea

Two Injured as Glomar’s OSV Hits Offshore Wind Turbine in North Sea

Huisman to Equip Capital Offshore’s PSVs with Four Cranes

Huisman to Equip Capital Offshore’s PSVs with Four Cranes

Sea1 Offshore Sells 2014-Built Offshore Construction Vessel

Sea1 Offshore Sells 2014-Built Offshore Construction Vessel

Current News

Lautec to Provide Inspection Services for 495MW Taiwanese OW Farm

Chuditch Gas Field Up for Summer Drilling Ops as Sunda Reshapes Ownership Structure

Iberdrola, Kansai Close $1.46B Deal for Baltic Sea Offshore Wind Farm

Eni Reports Smaller Profit Drop Than Expected

Subscribe for OE Digital E‑News

Offshore Engineer Magazine