Bulgaria well boost for Petroceltic

OE Staff
Monday, September 16, 2013

Petroceltic International has announced the successful tie-back of a new production well on the Kaliakra gas field, offshore Bulgaria.

The well was completed with a subsea wellhead and connected to the existing Kaliakra pipeline for export via the Galata platform. The well and flow line works were performed by the GSP Prometeu jack-up drilling rig and Big Foot 1 lay barge and finished on September 10.

The new well has been flow tested at rates in excess of 12MMcf/d and is currently being produced through the Galata facilities, which are shared with the Galata and Kavarna fields.

Once the production from the three fields has been rebalanced, the combined rate is expected to stabilise at around 30MMcf/d.  Petroceltic holds a 100% working interest in the fields and associated infrastructure.

Categories: Activity Europe Installation Shallow Water

Related Stories

Bibby Marine Inks Shipbuilding Contract for eCSOV with Spanish Shipyard

Russia Accuses Ukraine for Attempted Attack on TurkStream Gas Pipeline

Equinor Hires Subsea7 for Work Offshore Norway

Current News

Oil Dips on Larger US Crude Draw, Russia Sanctions

TVO Contracts 4C Global Consultancy to Support UK Clients

Protecting Employees in High-Risk Environments

Industry Award for Sustainable Drilling Waste Solution

Subscribe for OE Digital E‑News