Jumbo Completes Mooring Installation in Egypt

Laxman Pai
Tuesday, July 2, 2019

Netherlands-based Jumbo’s Fairplayer has completed the pre-installation and tensioning of a shallow water CALM buoy mooring system at a depth of 26 meters for the Mersa El-Hamra terminal offshore Egypt.

The heavy lift shipping and offshore transportation and installation contractor said in a press note that Jumbo’s scope included the pre-lay of 10 Stevshark drag anchors and 6 chain moorings and the subsequent tensioning of the mooring legs up to 512 metric tons, for our client WEPCO / Micoperi.

Given a short lead time, Jumbo said its project team managed to prepare for the full scope of work and provide the required project procedures, equipment and personnel on-time.

Categories: Offshore Shallow Water Mooring Industry News Activity Africa

Related Stories

TechnipFMC Lands Coral North FLNG Contract from Eni

Cadeler Launches 11th Offshore Wind Installation Vessel in China (Video)

Deepsea Mira Semi-Sub Up for Shell’s Drilling Job off Namibia

Current News

Equinor Renews Subsea Inspection Deal with Subsea 7

Saipem Gets DNV Certification for Offshore Asset Lifecycle Management

Archer to Remain North Sea Drilling and Maintenance Duty for Aker BP

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

Subscribe for OE Digital E‑News