UK-Denmark Subsea Power Cable Gig Awarded

Laxman Pai
Wednesday, July 24, 2019

The Italian electric power transmission specialists Prysmian, German multinational conglomerate Siemens and Swedish cable manufacturer have secured contracts worth a total 1.1 billion euros ($1.2 billion) to build the world’s longest subsea power cable, the Viking Link between Britain and Denmark.

National Grid and Energinet have recently announced that these cable and converter station suppliers are chosen for the UK’s first ever subsea electricity inter-connector to Denmark.

The 1.4 GW high voltage direct current inter-connector, which will be the longest in the world when completed, will stretch 768 kilometers from Lincolnshire to Western Denmark.

The project will consist of two parallel HVDC cables which will be manufactured and installed by Prysmian Powerlink S.r.l. and NKT HV Cables AB.

Industrial manufacturing company Siemens will be supplying and installing equipment for two converter station sites in Lincolnshire, UK and Revsing, Denmark.

The three contracts have a combined value of 1.1 billion Euros.

Viking Link will now move from development to the construction phase, with work in the UK and Denmark beginning next summer. Construction on Viking Link is expected to be completed by the end of 2023.

Categories: Transmission/Gears Subsea Subsea Cables Power Generation

Related Stories

ConocoPhillips Hires Subsea7 for Work Offshore Norway

DeepOcean Set for Long-Term IMR Duty with Vår Energi

NKT Expands Swedish Cable Accessories Plant Amid Rising Demand

Current News

Equinor Renews Subsea Inspection Deal with Subsea 7

Saipem Gets DNV Certification for Offshore Asset Lifecycle Management

Archer to Remain North Sea Drilling and Maintenance Duty for Aker BP

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

Subscribe for OE Digital E‑News