Helang FPSO Process System Delivered

Monday, August 12, 2019

Oilfield equipment and services company NOV said it has completed the first full topside process systems delivery for Helang FPSO redeployment.

NOV's Process and Flow Technologies business unit was contracted by Yinson to design and deliver the full topside process system for FPSO Helang. The delivery consisted of nine new process skids and modules: HP flare KO drum, export gas metering, gas turbine generator, inlet production separator, gas dehydration, TEG regen/flash gas compressor, export gas compressor, condensate heat skid and pipe rack.

The nine process modules were completed within 15 months, NOV said.

The FPSO Helang redeployment has been NOV's first full topside process systems delivery (separation, gas, and water treatment) and the first project with an integrated execution model, with engineering, procurement, and construction all done in-house. This not only minimized interfaces but helped deliver a fast-track project in a tight time schedule.

The project encompasses redeployment of the existing FPSO Four Rainbow—now named FPSO Helang—that will operate in Block SK10 offshore Sarawak, East Malaysia. NOV delivered topside modules for this FPSO in 2003 and further upgraded it with an additional module in 2009. The basis of design for the new fields (Helang and Layang) required significant modifications in the process systems.

Categories: Technology FPSO Hardware

Related Stories

Did You Know? Six Steps Cyber Attackers Take to Steal Maritime Data

Entrion Wind Secures US Patent for Deepwater Monopile Tech

Black & Veatch, Baker Hughes Combine Tech for Optimized Mid-Scale LNG Solution

Current News

Cadeler’s WTIV Newbuild Arrives to Rotterdam Ahead of Maiden Job

LR and SHI Join Forces for Green Ammonia FPSO System

BP, Equinor, Shell and TotalEnergies Pledge $500M to Boost Energy Access

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Subscribe for OE Digital E‑News