Energean Power FPSO Floated Out

Monday, September 23, 2019

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Categories: Engineering FPSO Floating Production Construction Natural Gas

Related Stories

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Cedar LNG Picks EXMAR for FLNG Marine Operations Role

Longitude Unveils Compact PSV Design Aimed at Cost Efficiency

Current News

QatarEnergy Receives Offshore Exploration License From Libya

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

TGS Embarks on Multi-Client 2D Survey off Angola

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Subscribe for OE Digital E‑News