Transocean Floater Deployed with Hybrid ESS

Wednesday, October 2, 2019
Transocean Spitsbergen (Photo: Aspin Kemp and Associates)

Transocean has deployed the world’s first hybrid energy storage system aboard a floating drilling unit. The system is now operational on the Transocean Spitsbergen, engaged in drilling operations at the Snorre field in Norway, the drilling contractor said on Wednesday.

Transocean’s patented hybrid power technology, developed in partnership with Aspin Kemp and Associates, reduces fuel consumption and increases a dynamically positioned rig’s station-keeping reliability by capturing energy generated during normal rig operations that would otherwise be wasted, and storing it in batteries. This energy is then used to power the rig’s thrusters. This important operational and safety enhancement targets a 14% reduction in fuel use during normal operations, leading to a significant reduction in NOx and CO2 emissions.

Transocean’s investment is funded in part through fuel saving incentives in its contract with Equinor and by the Norwegian NOx Fund.

“This first of its kind hybrid power upgrade will further enhance the reliability of our operations, while simultaneously reducing fuel consumption, operating costs and our environmental footprint,” said Jeremy Thigpen, President and CEO. “We are pleased and proud to work alongside Equinor to jointly identify and implement more efficient and sustainable technology to deliver high-value wells to the industry.”

Categories: Technology Drilling Rigs

Related Stories

Woodside Hires SLB for Trion Ultra-Deepwater Drilling Job off Mexico

Woodside Hires SLB for Trion Ultra-Deepwater Drilling Job off Mexico

CIP Orders Vestas Offshore Wind Turbines for 495MW Taiwanese Project

CIP Orders Vestas Offshore Wind Turbines for 495MW Taiwanese Project

IACS Publishes New Recommendation on 3D Printing

IACS Publishes New Recommendation on 3D Printing

Current News

Orbital Marine Gets LR Certification for O2-X Tidal Energy Turbine

Petrofac Scoops $500M Worth of Contracts So Far in 2025

RWE’s London Array Offshore Wind Farm to Power 40O UK Locations

Aker Solutions Gets Onboard Northern Lights CCS Project’s Next Phase

Subscribe for OE Digital E‑News

Offshore Engineer Magazine