Head Energy Clinches Brage Platform Well Hook-Up Work

OE Staff
Tuesday, March 24, 2020

Oil company Wintershall Dea has awarded Norwegian engineering firm  Head Energy a contract for two well hook-ups at the Brage Platform.

"This is a strategically important contract for us and a recognition of our skilled engineering team working with EPCIC offshore modification projects. We look forward to continuing our good cooperation with Wintershall Dea and contribute to increased production at the Brage Platform, says Head Energy’s Engineering Director.

Head Energy said the engineering work would begin immediately.

Brage is Wintershall Dea’s first manned platform in Norway. Located in the northern North Sea, 125 kilometers west of Bergen, it is one of the oldest producing platforms in Norway. 

First discovered in 1980, the field came into production in 1993 and has been in operation ever since.

When Wintershall Dea (then Wintershall) took over operatorship from Statoil (now Equinor) in 2013, the platform was granted a lifetime extension until 2030.

Categories: Engineering Industry News Activity Europe Production

Related Stories

TotalEnergies Asks EU to Clarify Russian LNG Ban

Transocean Secures $184M for Drilling Rigs Operating off Norway

HydroWing Wins 10MW CfD Boost for Morlais Tidal Energy Project

Current News

Petrobras’ P-79 FPSO Arrives to Brazil to Support Búzios Growth Plan

North Sea Wildcat Well Fails to Deliver for Vår Energi

TotalEnergies Asks EU to Clarify Russian LNG Ban

Norway Oil and Gas Investment Expected to Drop in 2026

Subscribe for OE Digital E‑News