Equinor to Shut Hammerfest LNG Plant for Two Weeks in May

Nerijus Adomaitis
Wednesday, May 6, 2020
Image Credit: Equinor

Equinor will shut down its Melkoyea liquefied natural gas (LNG) plant for two weeks of maintenance in the second half of May, the Norwegian oil and gas company said on Wednesday.

The shutdown of the plant, also called Hammerfest LNG, which liquefies natural gas from Equinor's Arctic Snoehvit field for export to the global market by tankers, will reduce production by 18 million cubic metres per day.

The company said the maintenance was a planned event, but it also comes at a time when demand is depressed amid coronavirus-related lockdown.

Equinor has a 36.8% stake in the Snoehvit field and the LNG plant. Its partners are Petoro with 30%, Total with 18.4%, Neptune Energy with 12% and Wintershall Dea with 2.8%. 

(Reporting by Nerijus Adomaitis, editing by Terje Solsvik)

Categories: Energy LNG Activity Arctic Inspection & Repair & Maintenance Barents Sea

Related Stories

SBM Offshore, Microsoft Team Up for Clean AI-Driven Floating Power Solutions

SBM Offshore, Microsoft Team Up for Clean AI-Driven Floating Power Solutions

Salunda Unveils Next-Gen Wireless Latch Monitoring Tool for Drilling Rigs

Salunda Unveils Next-Gen Wireless Latch Monitoring Tool for Drilling Rigs

Vard Cuts First Steel for Island Offshore’s Hybrid Construction Vessel

Vard Cuts First Steel for Island Offshore’s Hybrid Construction Vessel

Current News

DOF Hooks FPSO Installation Job Off Africa

Brava Energia, Shell Agree Oil Sale from Atlanta Field

OKEA Takes Stake in Aker BP-Operated Tverrdal Prospect in North Sea

First Foundations for 1.6GW German Offshore Wind Project Reach Dutch Port

Subscribe for OE Digital E‑News

Offshore Engineer Magazine