Sakhalin Energy Wraps Maintenance at Offshore Platform

Vladimir Soldatkin
Tuesday, June 22, 2021

Russian liquefied natural gas producer (LNG) Sakhalin Energy said on Monday a planned shutdown on its Piltun-Astokhskaya-B (PA-B) offshore oil and gas production platform had been successfully completed.

The PA-B platform was the first this year to shut for planned maintenance among the production assets of LNG plant Sakhalin-2, the company said this month.

Sakhalin Energy produced and shipped record volumes of LNG in 2020, topping 11.6 million tonnes. The company supplies LNG to the Asia-Pacific, with major customers in Japan, South Korea, Taiwan and China.

Equity holders in Sakhalin Energy include Gazprom, Royal Dutch Shell and Japanese firms Mitsui and Mitsubishi Corp.

(Reporting by Vladimir Soldatkin; Writing by Alexander Marrow; Editing by Edmund Blair)

Categories: Energy Activity Production Asia Inspection & Repair & Maintenance

Related Stories

NOV’s GustoMSC to Design Korea’s Wind Turbine Installation Vessel

Chevron Signs Oil Exploration Deal in Syrian Waters

Eni Enlists Shearwater for 3D Seismic Survey in Timor Sea

Current News

AF Offshore Secures North Sea Decom Job

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Petronas Takes Operatorship of Oman’s Offshore Block 18

Subscribe for OE Digital E‑News