Nexans' Cable for World's First Harsh-environment Floating Solar Plant

OE Staff
Wednesday, July 28, 2021

Offshore cable manufacturer Nexans will deliver export cable for Equinor's floating solar pilot offshore Frøya in Norway. 

The floating solar project is slated to come online in December 2021 and will be the world’s first floating solar plant operating in rough offshore waters.

The Frøya floating plant will measure 80 m x 80 m, with a height of less than 3 meters above the sea surface, hosting an array of solar panels capable of producing up to 1 megawatt.

Utility-scale floating solar power is currently one of the fastest-growing renewable technologies as governments and investors around the world explore every possibility for safer, sustainable, and decarbonized energy. This is expected to drive almost 10 gigawatt of new floating solar deployment by 2025, Nexans said.

Under the contract with Equinor, Nexans will supply a 22 kW export cable of 5 km to connect the floating platform from shallow waters to land. 

"The most challenging aspect for the cable construction is to handle the dynamic loadings as the connection at the platform end pitches up and down with the waves. Nexans is utilizing a three-core cable design of a type well proven in offshore wind farm and fish farming installations. The cable will be manufactured at Rognan plant in Norway," Nexans said.

 


Categories: Energy Offshore Energy Renewable Energy Engineering Subsea Industry News Activity Subsea Cables Solar

Related Stories

Beam’s AI-Driven AUV to Hit Offshore Wind Market in 2025

DOF Lands IMR Vessel and Subsea Services Contract in Asia Pacific

TGS Nets First 3D Streamer Job for 2025 Summer Season

Current News

Danos Leaders Recognized in “40 Under 40” Lists

ExxonMobil to Drill for Gas Off Cyprus in January

Mocean Energy Raising Funds to Advance Wave Energy Tech

Seadrill’s Drillships Getting Ready to Start Work Off Brazil

Subscribe for OE Digital E‑News