Shelf Drilling Lands ONGC Work

Friday, July 29, 2022

Dubai based jackup operator Shelf Drilling has been awarded a three-year contract for with India's Oil and Natural Gas Corporation for work on the Mumbai High. 

The contract is for the C.E. Thornton jack-up rig, with planned start-up of operations is Q2 2023. The C. E. Thornton was previously under contract to ONGC, alongside its F.G. McClintock jack-up, starting in 2019. 

The Marathon LeTourneau 53-SC rig was built in 1974 and upgraded in 1984 and is able to work in up to 300 ft water depth. 

Mumbai High, formerly Bombay High, is one of the largest offshore oilfields in India, located in the Arabian Sea, approximately 170 kilometers west of the Mumbai coast. The area consists of two blocks, called Mumbai High North and Mumbai High South, which started production in 1976.

Last month, a helicopter carrying seven passengers and two pilots ditched in the Arabian Sea near the Indian oil company ONGC's jack-up rig Sagar Kiran, in Mumbai High, offshore India. Four people died



Categories: Drilling Industry News Activity Rigs Jackup Drilling Hardware Drilling Rigs

Related Stories

Archer to Remain North Sea Drilling and Maintenance Duty for Aker BP

Aker BP Extends Scarabeo 8 Drilling Contract off Norway

Deepsea Bollsta Rig Gets New Name as Odfjell Drilling Takes Ownership

Current News

Equinor Renews Subsea Inspection Deal with Subsea 7

Saipem Gets DNV Certification for Offshore Asset Lifecycle Management

Archer to Remain North Sea Drilling and Maintenance Duty for Aker BP

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

Subscribe for OE Digital E‑News