FEED Contract Awarded for Ulsan Gray Whale 3 Floating Wind Farm in S. Korea

Wednesday, August 17, 2022

Technip Energies, in consortium with Subsea 7 and Samkang M&T, has been selected by Corio Generation and TotalEnergies to perform a Front-End Engineering Design (FEED) for their Ulsan Gray Whale 3 Offshore Windfarm project, located offshore the East Coast of South Korea. 

The FEED contract covers engineering for floater, mooring, and inter-array cable (IAC) in collaboration with a wind turbine supplier. The design of the floating foundation will include Technip Energies’ in-house floater technology INO15. 

With a capacity of 15 megawatts, INO15 technology is a three columns semi-submersible floater suited for large series production. 

The Gray Whale 3, aiming to develop a 504MW floating offshore wind farm located around 60 to 70 kilometers from Onsan Port in Ulsan, is one of the three offshore wind projects with a total installed capacity of 1.5 gigawatts that Corio Generation and TotalEnergies are promoting off the coast of Ulsan.

Categories: Energy Renewable Energy Engineering Industry News Activity Asia Offshore Wind

Related Stories

New Alliance Targets CTV Deliveries for Japanese Offshore Market

Cadeler’s WTIV Newbuild Arrives to Rotterdam Ahead of Maiden Job

Masdar, SOCAR and ACWA Set Sights on 3.5GW Offshore Wind Projects in Azerbaijan

Current News

Offshore Wind RoRo Vessel Rotra Futura Launched

Oil and Gas Output Trended High Before and After Trump

Eni Readies Second FLNG for Congo

QatarEnergy Boosts Offshore Stakes in Namibia

Subscribe for OE Digital E‑News