KENC Engineering Snags Key U.S. Offshore Wind Contract

Monday, January 30, 2023

KENC Engineering B.V. received a contract from an undisclosed party to design and build a Hammer Quick Lifting Frame. For hammering operations during the construction of two US offshore wind farms, KENC has the assignment to design and build a Hammer Quick Lifting Frame (HQLF). The HQLF integrates a Balltec quick connect receptacle and a 750mT piling hammer. The scope includes installation aids for easy onsite assembly. The tool will be delivered in Q1 of 2023 and deployed in the summer of 2023.

Categories: Technology Contracts Offshore Offshore Wind

Related Stories

Cadeler Welcomes Wind Pace WTIV Newbuild to its Fleet

Cadeler Welcomes Wind Pace WTIV Newbuild to its Fleet

IACS Publishes New Recommendation on 3D Printing

IACS Publishes New Recommendation on 3D Printing

GBM Works' New Tech Challenges Noise Pollution in Wind Turbine Installation

GBM Works' New Tech Challenges Noise Pollution in Wind Turbine Installation

Current News

Orbital Marine Gets LR Certification for O2-X Tidal Energy Turbine

Petrofac Scoops $500M Worth of Contracts So Far in 2025

RWE’s London Array Offshore Wind Farm to Power 40O UK Locations

Aker Solutions Gets Onboard Northern Lights CCS Project’s Next Phase

Subscribe for OE Digital E‑News

Offshore Engineer Magazine