KENC Engineering Snags Key U.S. Offshore Wind Contract

Monday, January 30, 2023

KENC Engineering B.V. received a contract from an undisclosed party to design and build a Hammer Quick Lifting Frame. For hammering operations during the construction of two US offshore wind farms, KENC has the assignment to design and build a Hammer Quick Lifting Frame (HQLF). The HQLF integrates a Balltec quick connect receptacle and a 750mT piling hammer. The scope includes installation aids for easy onsite assembly. The tool will be delivered in Q1 of 2023 and deployed in the summer of 2023.

Categories: Technology Contracts Offshore Offshore Wind

Related Stories

DNV, Seatrium Team Up for Innovation in Marine and Offshore

Cadeler’s WTIV Newbuild Arrives to Rotterdam Ahead of Maiden Job

Gazelle Wind Power Scoops $12M to Advance Floating Wind Technology

Current News

Oil Edges to 2-Week High on Ukraine News

EMGS to Conduct CSEM Survey Offshore India

Poland to Open New Areas for Offshore Wind Development in Baltic Sea

Swedish Firm Eyes Multi-Megawatt Wave Energy Farm Off Grenada

Subscribe for OE Digital E‑News