Enauta Restarts Production from Atlanta Field's 2HP Well in Brazil

Wednesday, April 19, 2023

Brazilian oil company Enauta has resumed production from the 7-ATL-2HP-RJS (“2HP”) well in Atlanta offshore field in Brazil, after a halt in early March.

Enauta said this week that production had resumed after the installation of the new pump on the seabed. 

"Enauta will keep the market informed of relevant events related to the matter," the company said without providing info on the field's current output levels.

Enauta produces oil from the Atlanta field using the Petrojarl I FPSO, which has a production capacity of 30,000 barrels of oil per day and a storage capacity of 180,000.

Late in March, Enauta said that daily production was around 22 thousand bbl/d from the Atlanta Field (without contribution from the 2HP well).

Categories: Industry News Activity FPSO Production South America Floating Production

Related Stories

MISC, PTSC Extend Ruby II FPSO Operations Offshore Vietnam

BW Offshore, McDermott Unveil Blue Ammonia FPSO Concept (Video)

Shell Reserve Decline Raises Need for Deals or Discoveries

Current News

Ndungu Full-Field Starts Up Offshore Angola

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

AKOFS Offshore Inks New Vessel Deal with Petrobras

UK Trade Body Challenges Government View on North Sea Gas Decline

Subscribe for OE Digital E‑News