Energos Celsius FSRU Reaches Its Final Destination

Monday, February 26, 2024

Energos Celsius floating storage and regasification unit (FSRU), on a long-term for New Fortress Energy (NFE), has arrived to NFE’s LNG terminal in Barcarena in Brazil’s Pará state.

The FSRU Energos Celsius was built by Seatrium and delivered to NFE in December 2023, which then departed from Singapore to Brazil.

The FSRU has a nominal regasification capacity of 750 million standard cubic feet per day (mmscfd), up to a maximum capacity of 1,000 mmscfd.

It is a critical part of NFE’s LNG terminal development at Barcarena which includes a long-term gas contract to supply Norsk Hydro at the Alunorte alumina refinery, a 630 MW gas-to-power project under construction by NFE, and further power and fuel expansion projects in the region.

The terminal is strategically located at the mouth of the Amazon River, and consists of an onshore terminal and offshore FSRU.

The Barcarena terminal is the first regasification terminal in the North of Brazil and will serve as the sole natural gas supply source for this region, bringing cleaner and more affordable energy to the Amazon.


Categories: LNG Industry News Activity Production South America FLNG FSRU

Related Stories

ExxonMobil Concludes $535M Liza Destiny FPSO Buy from SBM Offshore

Fifth FPSO for Petrobras’ Mero Field En Route to Brazil (Photos)

Expro Teams Up with Petrobras for New Well Flowmeter Tech

Current News

BOEM Okays New England Offshore Wind Project

Solstad Offshore Bolsters Ownership Stake in Omega Subsea

DeepOcean Takes Over Equinor’s Pipeline Repairs Contract from TechnipFMC

Petrobras Steps Closer to Developing Hydrogen Plant Powered by Renewables

Subscribe for OE Digital E‑News