Aramco, Sempra Set Sale and Purchase Terms for Port Arthur LNG Expansion Project

Wednesday, June 26, 2024
(Credit: Aramco)

Saudi Arabian state-owned oil and gas giant Aramco and Sempra, one of North America’s leading energy infrastructure companies, have executed a non-binding Heads of Agreement (HoA) for a 20-year sale and purchase agreement (SPA) for liquefied natural gas (LNG) offtake of 5.0 million tonnes per annum (Mtpa) from the Port Arthur LNG Phase 2 expansion project.

The HoA further contemplates Aramco’s 25% participation in the project-level equity of Phase 2.

Through the agreement signed through their respective subsidiaries, parties expect to execute a binding LNG SPA and definitive equity agreements with terms substantially equivalent to those in the HoA, with the SPA and equity agreements subject to a number of conditions.

“We are excited to take this next step into the LNG sector. As a potential strategic partner in the Port Arthur LNG Phase 2 project, Aramco is well placed to grow its gas portfolio with the aim of meeting the world’s growing need for lower-carbon sources of energy. This agreement is a major step in Aramco’s strategy to become a leading global LNG player,” said Nasir K. Al-Naimi, Aramco Upstream President.

“The planned expansion of Port Arthur LNG would help facilitate the broad distribution of U.S. natural gas across global energy markets. By expanding the global reach of the Port Arthur LNG facility, we have the opportunity to improve energy security, while providing a lower-carbon alternative to coal for electricity production,” added Jeffrey W. Martin, Sempra Chairman and CEO.

Port Arthur LNG is a natural gas liquefaction and export terminal in Southeast Texas with direct access to the Gulf of Mexico.

The Port Arthur LNG Phase 1 project is currently under construction and consists of trains 1 and 2, as well as two LNG storage tanks and associated facilities.

The Port Arthur LNG Phase 2 project is a competitively positioned expansion of the site to include the addition of up to two trains capable of producing up to 13 Mtpa.

At the heart of Sempra Infrastructure’s flagship Port Arthur Energy Hub, Port Arthur LNG has potential to expand to a total of eight trains, which would position it as one of the world’s most significant LNG export facilities.

The facility is expected to play an important role in enhancing global energy security and resilience. Moreover, Sempra Infrastructure is actively advancing infrastructure projects within the Port Arthur Energy Hub, addressing both the rising demand for lower-carbon fuels and carbon intensity reduction.

This includes the proposed Titan Carbon Sequestration project.

Categories: LNG Industry News Activity Natural Gas North America Gulf of Mexico

Related Stories

TotalEnergies Inks 15-Year LNG Supply Deal for Dominican Republic

TotalEnergies Inks 15-Year LNG Supply Deal for Dominican Republic

Fugro Cuts Jobs and Scales Back US Operations

Fugro Cuts Jobs and Scales Back US Operations

US Set for Oil and Gas Lease Round in Gulf of Mexico

US Set for Oil and Gas Lease Round in Gulf of Mexico

Current News

US Halts Empire Wind Project

China's First Offshore Hydrogen-Ammonia-Methanol Platform Starts Operating

Gas Reserves Estimate Goes Up at Shell’s Selene Prospect in North Sea

India Stretches Bids Deadline for 13 Offshore Deep-Sea Mineral Blocks

Subscribe for OE Digital E‑News

Offshore Engineer Magazine