Meet ZEUS, a Proposed Zero-emission Power Station

Tuesday, August 27, 2024

Aker Solutions, PETRONAS Carigali Sdn. Bhd., MISC Bhd and Clean Energy System Inc, signed a Memorandum of Understanding (MOU), effectively commencing the Zero Emission Power Station (ZEUS) pilot project, an energy solution that uses oxyfuel combustion with immediate CO2 capture and storage.

The ZEUS technology employs advanced oxyfuel combustion to convert high CO2 natural gas into dispatchable power while capturing 100% of the CO2 emissions. The CO2 is immediately injected into a reservoir for permanent storage or can be used to increase production of both oil and gas before being permanently stored.

The aim of ZEUS is the ability to handle the combustion at elevated pressures, enabling more compact and simplified process equipment, potentially leading to cost savings while enhancing CO2 management capabilities.

Another unique characteristic of oxyfuel combustion is that it can burn untreated gas straight from the well, including gas with up to 90% CO2. This opens the door for using gas reserves that would otherwise be considered uneconomic to develop.

Categories: Technology Energy People Industry News The Path to Zero Renewable Offshore Oil & gas

Related Stories

Northern Ocean Names New Chief Commercial Officer

EU’s Go-Ahead Brings $22M Wave Energy Scheme Step Closer to Offshore Deployment

Eidesvik Offshore’s CEO Resigns

Current News

TWP Hands in Offshore Scoping Report for 1GW Scottish Offshore Wind Farm

Malaysia’s First Hybrid Fast Crew Boat Gets Launched

Vallourec Boosts Pipe Coating Offering with Latest Acquisition

Nexans to Link Orkney Islands with UK Mainland via 220MW Interconnector

Subscribe for OE Digital E‑News