International Consortium Secures Work on LNG Scheme off Mozambique

Monday, September 30, 2024

McDermott, through a consortium with Saipem and China Petroleum Engineering and Construction Corporation, has been awarded a front-end engineering design (FEED) contract for the Rovuma LNG Phase 1 project in Mozambique.

The project is a joint venture between ExxonMobil Development Africa, Eni and CNODC Dutch Cooperatief.

Rovuma LNG Phase 1 includes liquefaction and export of natural gas extracted from the Offshore Area 4 fields off the Afungi Peninsula in Mozambique.

The FEED contract scope of work includes the modular design of a greenfield LNG production facility in Afungi, all associated gas pre-treatment units and the utilities and offsite systems to support the LNG production.

The plant will have an overall production capacity of 18 million tons per annum (MTPA). The scope of work also includes the engineering, procurement and construction proposal.

"LNG helps shape an entirely new era of energy solutions and McDermott plays a significant role in this global shift with more than 60 years of LNG experience.

"McDermott is well established in Mozambique and can apply this knowledge and experience to continue the country's industrial, social and economic development,” said Rob Shaul, Senior Vice President of McDermott's Low Carbon Solutions business.

Categories: LNG Engineering Industry News Activity Africa Oil and Gas

Related Stories

Eni Confirms Large Gas, Condensate Find off Ivory Coast

TGS Embarks on Multi-Client 2D Survey off Angola

Eni’s Congo LNG Phase 2 Begins Exports with First LNG Cargo (Video)

Current News

Op/Ed: Crude Oil's Iran Premium Assumes No Supply Disruption

Turkey Objects to Greece’s Chevron Energy Deal in Eastern Mediterranean

MOL’s Geoinform, Baker Hughes Team Up for Oil and Gas Tech

MISC Secures Long-Term Charter for Papua New Guinea's First FSO

Subscribe for OE Digital E‑News