CNOOC Brings Online Second Phase of Luda Oil Field Project in Bohai Sea

Friday, February 21, 2025
Luda 5-2 North Oilfield Phase II Development Project (Credit: CNOOC)

China's state-owned oil and gas firm China National Offshore Oil Corporation (CNOOC) has started production at Luda 5-2 North Oilfield Phase II Development Project in the central part of Bohai Sea.

The main production facilities at the project include one new auxiliary production platform and one production wellhead platform.

A total of 29 development wells are planned to be commissioned, including 28 production wells and one water source well.

The project is expected to achieve a peak production of approximately 6,700 barrels of oil equivalent per day in 2026. The oil property is heavy crude.

Luda 5-2 North Oilfield is the first oilfield to produce from super heavy oil reservoirs through thermal recovery in China.

Its Phase I Project had already commenced production in 2022. CNOOC Limited made major technological breakthroughs in this project and significantly enhanced the development efficiency of offshore super heavy oil.

The Phase II Project will further tap the resources of the oilfield. Through optimized jet pump injection-production technology, the project realized efficient and economic development of heavy crude, which could further enhance the Company’s energy supply capacity. 

CNOOC holds 100% interest in this project and is the operator.

Categories: Industry News Activity Production Asia Oil and Gas

Related Stories

Golar LNG Brings In Chinese Investors for FLNG Gimi Refinancing

Golar LNG Brings In Chinese Investors for FLNG Gimi Refinancing

Apollo to Pay $1B for 25% Stake in BP Pipelines

Apollo to Pay $1B for 25% Stake in BP Pipelines

Triton FPSO Not Expected to Come Back Online Before May

Triton FPSO Not Expected to Come Back Online Before May

Current News

Valeura’s Assets in Gulf of Thailand Remain Operational After Earthquake

CIP Orders Vestas Offshore Wind Turbines for 495MW Taiwanese Project

First Turbine Stands Tall at RWE’s Sofia Offshore Wind Farm

Bardex Corporation, Gabriel Engineering Partner Up for Floating Wind Moorings

Subscribe for OE Digital E‑News

Offshore Engineer Magazine