Wood Group wins Tolmount FEED

Published

Premier Oil awarded Wood Group a contract to deliver front-end engineering design (FEED) to the Tolmount offshore field development in the Southern North Sea.  

Effective immediately, Wood Group will provide topsides, jacket, pipeline, flow assurance and subsea engineering expertise for Premier’s Tolmount offshore assets and export pipeline, which ties into the Dimlington onshore terminal in Humberside.

“This award demonstrates the integrated solutions that we are uniquely positioned to provide; bringing facility engineering, specialist technical solutions and our operational reputation to front end engineering design,” says Robin Watson, Wood Group chief executive. “We are committed to delivering a full systems engineering approach from the subsea wellhead, through the offshore facilities, export pipeline and to the onshore terminal, complete with end-to-end flow assurance.  

This contract adds to Wood Group’s support of Premier Oil in the UKCS. The company was recently awarded a US$50 million contract to deliver topside operations and maintenance services to the Balmoral floating production vessel in the Central North Sea, and the Solan installation, West of Shetland.

Current News

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

Tekmar Secures Over $9M Offsho

TechnipFMC Lands Coral North FLNG Contract from Eni

TechnipFMC Lands Coral North F

Equinor Books Odfjell Drilling’s Deepsea Aberdeen Semi-Sub Rig

Equinor Books Odfjell Drilling

Harbour Energy Finds Oil and Gas in North Sea

Harbour Energy Finds Oil and G

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine