Commercial production began at Sapinhoá field in January. Located in block BMS9 in Brazil’s presalt region, the first producing well, Guara1, was connected to the FPSO Cidade de São Paulo. Guara1 has a potential production rate of 25,000b/d. With more wells to be connected to the FPSO, a production rate of 120,000b/d could be achieved by 1H 2014.