Cutting steel

Heerema Fabrication Group has cut first steel for the US$2.26 billion Cygnus gas field located in the southern North Sea. The steel will be used in the 1600t Cygnus Alpha Wellhead Platform, the first of four. GDF Suez E&P operates the Cygnus partnership with 39.75% interest. Its partners include Centrica (48.75%) and Baynerngas (12.5%).

Current News

OE’s 2024 Top of the Festive Video Pops

OE’s 2024 Top of the Festive V

Offshore Drilling 2025: 3 Things to Watch During a Year of Market Corrections

Offshore Drilling 2025: 3 Thin

Chevon’s Sanha Lean Gas Connection Project Achieves First Gas off Angola

Chevon’s Sanha Lean Gas Connec

BP and Partners Secure Rights for 450MW Offshore Wind Farm in Japan

BP and Partners Secure Rights

Subscribe for OE Digital E‑News

Offshore Engineer Magazine