Quadrant secures rig for Phoenix-3 drilling

Published

Quadrant Energy has agreed a contract with Transocean to drill the Phoenix South-3 well in the WA-435-P exploration permit on the North-West Shelf of Australia.  

Drilling is due to start between 1 February and 1 April 2018 using the GSF Development Driller-1, a sixth generation semisubmersible, says partner Carnarvon.

The well is a redrill of the Phoenix South-2 well that discovered gas and condensate at the top of the Caley interval, but was unable to drill through and evaluate due to high pressures encountered.

The Phoenix South Caley structure is estimated to contain 489 Bcf gas and 57 MMbbl associated condensate gross mean recoverable prospective resource, or 143 MMboe in total. 

"The estimated condensate-to-gas ratio is very significant and is based on surface gas sampling from a permeable section at the top of the Caley Sandstone encountered while drilling the Phoenix South-2 well," says Carnarvon.    

The well is in about 100m water depth, approximately 160km northeast of Port Hedland in the Bedout sub-basin of the greater Roebuck basin. 

Quadrant and Carnarvon are jointly exploring the neighboring Phoenix and Roc licenses. The firms are expected to drill the Dorado prospect, 15km from the Roc discovery later this year. Additional resources on Dorado will at to the Phoenix and Roc resources and a potential development project.

Current News

Namibia will not recognise TotalEnergies and Petrobras due to non-compliance with procedure

Namibia will not recognise Tot

Venterra Company, CAPE Holland, Awarded Contract for Fengmiao Offshore Wind Farm

Venterra Company, CAPE Holland

Bae Systems Launches Incubator Program to Propel Technologies Beyond Defense

Bae Systems Launches Incubator

DOF Group ASA Contract Award for Well Intervention Services in North America

DOF Group ASA Contract Award f

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine