Eni gets Aurelia green light

Published

Norway’s Petroleum Safety Authority (PSA) has given Eni Norge consent to drill an exploration well in Block 7222 in the Barents Sea.

Eni Norge is the operator for production license 226 in the Barents Sea. The well is to be drilled in a prospect named Aurelia, with the designation 7222/1-1.

Water depth at the site is 424m. Drilling is estimated to last for 58 days, depending on whether a discovery is made.

Drilling is to be performed by Saipem's Scarabeo 8 semisubmersible drilling facility of the Moss CS 50 MkII design. The facility is winterized and is designed for working at water depths of between 70-3050m.

Image of the Scarabeo 8, from PSA.

Current News

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Aquaterra Energy Gets Multi-Ye

Two DOF Vessels Get Work in North Sea and Australia

Two DOF Vessels Get Work in No

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Seatrium Unit Launches Arbitra

Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs

Transocean-Valaris Tie-Up to C

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine