Eni gets Goliat orders from PSA

During the period of 5-7 January 2016, the Petroleum Safety Authority (PSA) Norway conducted an audit on ENI Norge's facility Goliat FPSO. The audit was conducted as a follow-up to an audit carried out in June 2015 linked to logistics on Goliat.

The PSA carried out a number of logistics audits in 2012, 2014 and 2015. Non-conformities and improvement points were identified during all of these audits. The PSA's logistics audit on Goliat conducted in June 2015 revealed that many of the same circumstances, both technical and operational, which were identified during the previous audits, had still not been rectified.

The aim of the audit in January 2016 was to assess whether the requirements laid down in the regulations concerning logistics and the requirements for employee participation were now being complied with.

From the January 2016 audit, serious breaches of the regulations were identified. On the basis of this, we have notified ENI of the following two orders:

  1. Pursuant to the Framework Regulations, section 69 concerning administrative decisions, with reference to section 22 of the Management Regulations concerning non-conformity processing, section 82 of the Facilities Regulations concerning entry into force, with reference to section 12 of the Facilities Regulations (as at 2009) concerning materials handling and transport routes, access and evacuation routes, and section 24 of the Facilities Regulations (as at 2009) concerning lighting, ENI Norge is ordered to:

    • implement measures to correct the non-conformities presented in section 5.1.4 of the report.

    • systematically review and map all areas and systems within logistics and assess compliance with requirements for materials handling and lighting 

    • present a binding and time-delimited plan with a deadline for corrective measures following the mapping, and a statement of priorities as regards the measures, along with a description of any compensatory measures which will be implemented until the non-conformities have been corrected.

  2. Pursuant to section 69 of the Framework Regulations concerning administrative decisions, with reference to section 17 of the Framework Regulations on the duty to establish, monitor and further develop management systems, section 6 of the Management Regulations on the management of health, safety and the environment, section 8 concerning internal requirements, section 15 of the Management Regulations concerning information and section 22 of the Management Regulations concerning non-conformity processing, ENI Norge is ordered to:

    • conduct a coherent review of, complete and implement its management system for logistics. As part of the above, it must be ensured that:

      1. roles and responsibilities are clearly defined and understood

      2. relevant requirements are applied and visible 

      3. necessary information is disseminated to relevant users at the right time 

      4. non-conformities are systematically registered and followed up 2 

      5. employee participation is ensured - competence and training are ensured

With reference to sections 5.1.1, 5.1.2, 5.1.3, 5.1.5 and 5.1.6 of the report

The deadline for complying with the above orders is set at 3 April 2016. 

Two further non-conformities were identified linked to follow-up of loose lifting equipment, and inspection and maintenance of wire rope. In addition, an improvement point was identified in connection with offshore cranes.

Current News

Key Strategies to Strengthen Maritime Cyber Security

Key Strategies to Strengthen M

Angola Outlines Plans for Multi-Year Oil and Gas License Rounds from 2026

Angola Outlines Plans for Mult

Beating the Heat: R.W. Fernstrum & Company Turns 75

Beating the Heat: R.W. Fernstr

Vårgrønn Enters German Offshore Wind Market with Baltic 2 Acquisition

Vårgrønn Enters German Offshor

Subscribe for OE Digital E‑News

Offshore Engineer Magazine