Harkand completes IRM job off Trinidad

Harkand completed an inspection, repair and maintenance (IRM) campaign for BP Trinidad and Tobago (BPTT) utilizing the Harkand Da Vinci diving support vessel (DSV) and the company’s new hyperbaric rescue facility (HRF) in the Caribbean.

The Harkand Da Vinci DSV. mage from Harkand.

The IRM scope included deadleg inspection of BPTT offshore assets, pipeline intervention, caisson repair works, platform and pipeline clamps installation and inspection and recovery of a caisson section. Harkand provided a full suite of services including saturation and surface diving, ROV, survey, inspection as well as project management and engineering for the execution of the campaign.

This was also the first project for the new HRF built by Harkand in the Gulf of Mexico in August 2015. The HRF was set up in Chaguaramas on the North West peninsula of Trinidad for the campaign.

John Reed, Harkand chief executive officer said: “Securing this contract with BP Trinidad and Tobago was a significant win in the region. The work involved an array of specialist subsea services and engineering, cementing our track record in the area.”

The IMCA compliant, DNV classed Harkand Da Vinci is equipped with a 140 Te active heave compensated (AHC) crane, an 18-man twin bell saturation diving system rated to 300m water depth, one three-man wet bell and one two-man surface diving system. The vessel was mobilized with two remotely operated vehicles (ROV) – one light work class and one inspection class ROV.

Current News

Cadeler’s WTIV Newbuild Arrives to Rotterdam Ahead of Maiden Job

Cadeler’s WTIV Newbuild Arrive

LR and SHI Join Forces for Green Ammonia FPSO System

LR and SHI Join Forces for Gre

BP, Equinor, Shell and TotalEnergies Pledge $500M to Boost Energy Access

BP, Equinor, Shell and TotalEn

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Seatrium Delivers Fifth Jack-U

Subscribe for OE Digital E‑News

Offshore Engineer Magazine