SPT Offshore gets LOI for Ophir wellhead platform

SPT Offshore has received the letter of intent (LOI) for the detailed design of the suction pile foundation, design supervision of the jacket and full transportation and installation of the Ophir wellhead platform from Muhibbah Engineering.

The jacket with integrated suction pile foundation will be installed in one piece offshore.

Muhibbah is the EPCIC contractor for this project, which is based on SPT Offshore’s solution consisting of a tri-legged jacket with an integrated suction pile foundation.

Ophir Production is a joint venture company between Octanex (50%), Scomi D&P (30%) and Vestigo Petroleum (20%).

Current News

Danos Leaders Recognized in “40 Under 40” Lists

Danos Leaders Recognized in “4

ExxonMobil to Drill for Gas Off Cyprus in January

ExxonMobil to Drill for Gas Of

Mocean Energy Raising Funds to Advance Wave Energy Tech

Mocean Energy Raising Funds to

Seadrill’s Drillships Getting Ready to Start Work Off Brazil

Seadrill’s Drillships Getting

Subscribe for OE Digital E‑News

Offshore Engineer Magazine