SPT Offshore gets LOI for Ophir wellhead platform

SPT Offshore has received the letter of intent (LOI) for the detailed design of the suction pile foundation, design supervision of the jacket and full transportation and installation of the Ophir wellhead platform from Muhibbah Engineering.

The jacket with integrated suction pile foundation will be installed in one piece offshore.

Muhibbah is the EPCIC contractor for this project, which is based on SPT Offshore’s solution consisting of a tri-legged jacket with an integrated suction pile foundation.

Ophir Production is a joint venture company between Octanex (50%), Scomi D&P (30%) and Vestigo Petroleum (20%).

Current News

European LNG Imports Up with Asian Influx

European LNG Imports Up with A

Strohm Rolls Out Pipe Design Tool

Strohm Rolls Out Pipe Design T

US Oil Majors Set to Curb ‘Drilling Boom’ Expectations Despite Trum Calls

US Oil Majors Set to Curb ‘Dri

Dana Petroleum Keeps Imrandd for UK Assets’ Integrity Services

Dana Petroleum Keeps Imrandd f

Subscribe for OE Digital E‑News

Offshore Engineer Magazine