Geoquip’s Deep Investigator ready to go

Published

Geoquip Marine’s DP2 vessel, the Deep Investigator, is now fully operational after having completed significant vessel conversions, including the installation of a moonpool, the modernization of the accommodations and the installation of the GMR600 drill rig.

Sea trials were completed successfully in March. The GMR600 drilling package is designed to maximize safe operational time on the drill floor and minimize manual handling. It is equipped with a mechanical drill pipe handling system that can be accessed and operated from the drilling console cabin. The vessel provides exceptional station-keeping in adverse weather and currents. 

The Deep Investigator is fitted with a heave-compensated 60-on (dynamic) single derrick drill rig (GMR600). In standard mode, the rig can operate with steel drill string lengths of 800m or with aluminum up to 1200m. The rig can be upgraded for larger water depths.

Current News

Martens en Van Oord Purchases Autonomous Survey Vessel From Demcon unmanned systems

Martens en Van Oord Purchases

Mubadala Hires SLB for Deepwater Drilling Services Offshore Indonesia

Mubadala Hires SLB for Deepwat

Cydome Rolls Out Remote Cybersecurity Tool for Offshore Wind Farms

Cydome Rolls Out Remote Cybers

BW Offshore, McDermott Unveil Blue Ammonia FPSO Concept (Video)

BW Offshore, McDermott Unveil

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine