ABB inks $20m offshore vessel contracts

Power and automoation group ABB has won contracts worth more than US$20 million to supply electrical power and propulsion systems for two next-generation offshore vessels. 

The first vessel, of ULSTEIN SX165 design (pictured), is being constructed at Ulstein Verft in Norway for Island Ventures 11, the joint venture set up in 2012 between US and Norwegian owners Edison Chouest Offshore and Island Offshore. 

At 28m-wide and 145.7m-long, and with accommodation for 200 people, the SX165 will be the largest vessel constructed by Ulstein Verft and is due for delivery in Q3 2015. It is equipped with two cranes that can lift 400-ton and 140-ton respectively, and has three separate engine rooms to provide extreme operational reliability. 

ABB is to supply an advanced complete power and diesel electric system package comprising medium voltage generators, switchboards, transformers, frequency converters and motors to provide reliable and fuel efficient propulsion. Health, safety and the environment have been a key focus in the design of the vessel and ABB’s scope of supply reflects this through its advanced power system, which is capable of achieving the requirements needed to run the system in closed ring in DP3. 

The second vessel, for Island Offshore, features the innovative Rolls-Royce UT 777 design for optimal subsea operations, including top hole drilling, light well intervention, subsea construction and inspection, maintenance, and repair work. ABB will supply an advanced complete power and diesel electric system package comprising medium voltage generators, switchboards including power management system, transformers, frequency converters and motors. ABB will also supply complete fire and gas monitoring and control systems for fire and gas detection. 

In addition, both power distribution and propulsion systems will be monitored by ABB’s remote diagnostic system (RDS), which helps to reduce repair time of installations and improve operational safety when reducing the need for on-site visits by providing immediate 24/7 assistance from a global technical center. 

The second vessel will be constructed at Kawasaki Heavy Industries in Japan and delivery is scheduled for 2017. 

"ABB’s advanced power system and remote diagnostic system will maximize the operational flexibility and safety.” said Heikki Soljama, head of ABB’s Business Unit Marine and Cranes. “We look forward to cooperating in the projects and to delivering high quality services to these pioneering new ships.” 

 

 
 

Current News

BOEM Okays New England Offshore Wind Project

BOEM Okays New England Offshor

Solstad Offshore Bolsters Ownership Stake in Omega Subsea

Solstad Offshore Bolsters Owne

DeepOcean Takes Over Equinor’s Pipeline Repairs Contract from TechnipFMC

DeepOcean Takes Over Equinor’s

Petrobras Steps Closer to Developing Hydrogen Plant Powered by Renewables

Petrobras Steps Closer to Deve

Subscribe for OE Digital E‑News

Offshore Engineer Magazine