Canada LNG project numbers

Published

Canadian LNG update from Norway's Rystad Energy AS:

As of November 2013, there were no approved liquified natural gas export terminals in Canada.

There are three proposed projects: Kitimat – Apache, Douglas Island, and Kitimat – LNG Canada, all located in British Columbia with a cumulative capacity of 4.18 Bcf/d. Additional potential export sites in British Columbia would have, if approved, a cumulative capacity of 11.07 Bcf/d.

In the best-case scenario (assuming approval of all the projects), the combined capacity of 15.25 Bcf/d would make it possible to export the entire gas production from the largest gas producing projects in western Canada – Montney Play, Horn River Shale, Duvernay, Liard Shale, Corodova Shale etc. The estimated gas production in Western Canada as of 2030 is ~18 Bcf/d – all projects combined.

As of November 2013, the LNG landed prices in Korea and Japan reached $15.65/MMbtu. This is 17% above November 2012 ($13.02/MMbtu) and 7% below the November 2011 levels ($16.68/MMbtu), based on US Federal Energy Regulatory Commission (FERC) data.

Current News

Namibia will not recognise TotalEnergies and Petrobras due to non-compliance with procedure

Namibia will not recognise Tot

Venterra Company, CAPE Holland, Awarded Contract for Fengmiao Offshore Wind Farm

Venterra Company, CAPE Holland

Bae Systems Launches Incubator Program to Propel Technologies Beyond Defense

Bae Systems Launches Incubator

DOF Group ASA Contract Award for Well Intervention Services in North America

DOF Group ASA Contract Award f

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine