Bulgaria well boost for Petroceltic

Published

Petroceltic International has announced the successful tie-back of a new production well on the Kaliakra gas field, offshore Bulgaria.

The well was completed with a subsea wellhead and connected to the existing Kaliakra pipeline for export via the Galata platform. The well and flow line works were performed by the GSP Prometeu jack-up drilling rig and Big Foot 1 lay barge and finished on September 10.

The new well has been flow tested at rates in excess of 12MMcf/d and is currently being produced through the Galata facilities, which are shared with the Galata and Kavarna fields.

Once the production from the three fields has been rebalanced, the combined rate is expected to stabilise at around 30MMcf/d.  Petroceltic holds a 100% working interest in the fields and associated infrastructure.

Current News

Equinor Renews Subsea Inspection Deal with Subsea 7

Equinor Renews Subsea Inspecti

Saipem Gets DNV Certification for Offshore Asset Lifecycle Management

Saipem Gets DNV Certification

Archer to Remain North Sea Drilling and Maintenance Duty for Aker BP

Archer to Remain North Sea Dri

Tekmar Secures Over $9M Offshore Wind Cable Protection Deal

Tekmar Secures Over $9M Offsho

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine