FPSO Cidade de Paraty beginning production from the Lula Nordeste field

Published

Cidade de Paraty in production

FPSO Cidade de Paraty went on stream, beginning production from the Lula Nordeste field in the Santos Basin presalt play. It is about 300km off Brazil, in the northeast corner of Block BM-S-11.

The FPSO can process up to 120,000bo/d and 5MMcm/d of gas. Petrobras, operator, said the first well (7-LL-11-RJS) to be connected to the platform has the potential to produce 25,000b/d, but it will be restricted to 13,000b/d during the first month as processing and reinjection systems are commissioned. Petrobras will connect another seven production wells and six injection wells. Peak production, 120,000 b/d, is expected for 2H 2014.

Current News

Op/Ed: Crude Oil's Iran Premium Assumes No Supply Disruption

Op/Ed: Crude Oil's Iran Premiu

Turkey Objects to Greece’s Chevron Energy Deal in Eastern Mediterranean

Turkey Objects to Greece’s Che

MOL’s Geoinform, Baker Hughes Team Up for Oil and Gas Tech

MOL’s Geoinform, Baker Hughes

MISC Secures Long-Term Charter for Papua New Guinea's First FSO

MISC Secures Long-Term Charter

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine