PSA Audits Xmas Tree for Snorre Expansion

Published

Illustration off the Snorre expansion field (Image: Equinor)
Illustration off the Snorre expansion field (Image: Equinor)

Norway's offshore watchdog the Petroleum Safety Authority (PSA) said it has carried out an audit of Equinor and the fabrication of the subsea Christmas tree for the Snorre expansion project.

The objective of the February audit was to ensure that fabrication of the subsea Christmas tree for the Snorre expansion project complied with the company’s own requirements and requirements in the regulations, PSA said. A sub-goal was to follow up how the project is undertaking its supervisory duty in respect of its supplier, TechnipFMC.

PSA siad it did not identify any non-conformities during the audit, but observed two areas with potential for improvement related to follow-up of suppliers and qualification of materials.

PSA said it has asked Equinor for feedback by April 11.

The NOK 19 billion Snorre expansion project involves a large scale subsea development, upgrading of the Snorre A installation, increased gas injection and gas import for injection. Scheduled to start production in 2021, the Snorre expansion project will increase recovery from the field by almost 200 million barrels and extend the field life beyond 2040.

Current News

TGS Embarks on Multi-Client 2D Survey off Angola

TGS Embarks on Multi-Client 2D

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Orbital Marine Grows UK and Ca

SIT, Seatrium Launch Offshore and Marine Digital Learning Lab

SIT, Seatrium Launch Offshore

Elemental Energies Expands Subsurface Expertise with APT Buy

Elemental Energies Expands Sub

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine