Energean Power FPSO Floated Out

Published

A timelapse video from Energean shows the floating production, storage and offloading unit (FPSO) Energean Power being built over 10 months and then floated out from a COSCO shipyard in Zhoushan, China.

The FPSO, which floated out in mid-September, will head to the Sembcorp Marine Admiralty Yard in Singapore for outfitting and topsides integration work before being deployed as part of the Energean-operated Karish gas project offshore Israel. First gas is expected in the first quarter of 2021.

The $1.4 billion project is being managed by TechnipFMC.

Current News

Libya Awards First Oil Blocks Since 2007 to Chevron, Eni

Libya Awards First Oil Blocks

TGS Embarks on Multi-Client 2D Survey off Angola

TGS Embarks on Multi-Client 2D

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Orbital Marine Grows UK and Ca

SIT, Seatrium Launch Offshore and Marine Digital Learning Lab

SIT, Seatrium Launch Offshore

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine