Subsea 7 Wins Chevron Gulf of Mexico Work

(Photo: Subsea 7)
(Photo: Subsea 7)

Offshore services company Subsea 7 on Friday announced it has secured a contract from Chevron for the subsea installation services at the St. Malo field, located in the Walker Ridge area of the Gulf of Mexico.

Subsea 7’s scope of work includes project management, engineering, procurement, construction and installation (EPCI) of the multiphase pump system at the St. Malo field, a 14 mile water injection flowline system, inclusive of a Swagelining polymer lined flowline, and the water injection control system, the company said.

Project management and engineering will commence immediately at Subsea 7’s offices in Houston. Fabrication of the water injection flowline and riser will take place at Subsea 7’s spoolbase in Ingleside, Texas, with offshore operations occurring in 2021.

Craig Broussard, Vice President for Subsea 7 US, said, “The St. Malo multiphase pump system and water injection projects award is an important win for the Gulf of Mexico region. It combines the utilization of our newest pipelay vessel, the Seven Vega, along with Subsea 7’s proven project execution capabilities and Swagelining’s polymer lining technology. In addition, the combination of the SURF scope for Subsea 7 and ongoing subsea equipment delivery by OneSubsea, will allow the Subsea Integration Alliance to work in collaboration with Chevron to unlock the value of an integrated approach to project optimization.”

Current News

Cadeler’s WTIV Newbuild Arrives to Rotterdam Ahead of Maiden Job

Cadeler’s WTIV Newbuild Arrive

LR and SHI Join Forces for Green Ammonia FPSO System

LR and SHI Join Forces for Gre

BP, Equinor, Shell and TotalEnergies Pledge $500M to Boost Energy Access

BP, Equinor, Shell and TotalEn

Seatrium Delivers Fifth Jack-Up to Borr Drilling

Seatrium Delivers Fifth Jack-U

Subscribe for OE Digital E‑News

Offshore Engineer Magazine