ExxonMobil Starts Oil Production in Guyana

(Photo: Hess)
(Photo: Hess)

ExxonMobil announced Friday it has begun oil production from the deepwater Liza field offshore Guyana ahead of schedule and less than five years after the first discovery of hydrocarbons.

Production from the first phase of the Liza field, located in the 6.6 million acre Stabroek Block, is expected to reach full capacity of 120,000 barrels of oil per day in coming months, and the first cargo is set to be sold within several weeks, the US supermajor said.

“This historic milestone to start oil production safely and on schedule demonstrates ExxonMobil’s commitment to quality and leadership in project execution,” said Darren Woods, chairman and chief executive officer of ExxonMobil.

The concept design for the Liza Phase 1 development project features the Liza Destiny floating, production, storage and offloading (FPSO) vessel moored 190 kilometers offshore Guyana, and four subsea drill centers supporting 17 wells.

ExxonMobil and its direct contractors have spent approximately $180 million with more than 630 local suppliers since the first discovery in 2015.

A second FPSO, Liza Unity, with a capacity to produce up to 220,000 barrels of oil per day is under construction to support the Liza Phase 2 development, and front-end engineering design (FEED) is underway for a potential third FPSO, the Prosperity, to develop the Payara field upon government and regulatory approvals. ExxonMobil anticipates that by 2025 at least five FPSOs will be producing more than 750,000 barrels per day from the Stabroek Block. 

The current estimated discovered recoverable resource for the Stabroek Block is more than 6 billion oil equivalent barrels. Esso Exploration and Production Guyana Limited is operator and holds 45% interest. Hess Guyana Exploration Ltd. holds 30% interest and CNOOC Nexen Petroleum Guyana Limited holds 25% interest.

Current News

BOEM Okays New England Offshore Wind Project

BOEM Okays New England Offshor

Solstad Offshore Bolsters Ownership Stake in Omega Subsea

Solstad Offshore Bolsters Owne

DeepOcean Takes Over Equinor’s Pipeline Repairs Contract from TechnipFMC

DeepOcean Takes Over Equinor’s

Petrobras Steps Closer to Developing Hydrogen Plant Powered by Renewables

Petrobras Steps Closer to Deve

Subscribe for OE Digital E‑News

Offshore Engineer Magazine